Home2018-11-07T14:39:21+00:00

HOW DOES  THE START INTO MY PREDICTIVE MAINTENANCE PROJECT SUCCEED?

Predictive maintenance is quite simply THE             “Industrie 4.0” theme for the German market.

EDAG PS HACKATHONS offer you a cost-efficient and low-risk way to quickly develop your own predictive maintenance potential in just a few days, ensuring that this methodology no longer remains a future dream for you and facilitating your entry into predictive maintenance.

Get started by clicking on our blog post.

DISCOVER THE HACKATHON CONCEPT

FACTORY OF THE FUTURE: OPTIMIZE PRODUCTION WITH INDUSTRY 4.0

Whether with 3D-visualization, a digital twin or state-of-the-art simulation techniques: The methods and techniques of Industry 4.0 connect people, machines, processes and development closely in the realization of your factory of the future.

We at EDAG PS are drivers of this technological revolution and we apply the latest digital technology to optimize the planning and design process, to digitally validate production, and to ensure smooth and trouble-free commissioning.

READ MORE

Customer project in automotive industry: VOLVO CAR CORPORATION

Design and delivery of body in white fixtures for the adhesive joining of carbon fiber reinforced plastic.


Read more about the project scope on our reference page.

READ REFERENCE

ON YOUR WAY TO THE FACTORY OF THE FUTURE WE ARE YOUR RESPONSIBLE PARTNER FOR PROJECT MANAGEMENT AND NETWORKED PRODUCTION ENGINEERING.

EDAG PS IN NUMBERS (AS OF 31.DEC 2017)

1448

EMPLOYEES

27

LOCATIONS

1015

CLIENTS

156.4 M

$ GROSS PERFORMANCE

OUR SATISFIED CLIENTS

“HIGHLY SATISFIED, SMOOTH PRODUCTION”

Jörg Fahrenbach,
HAEMA AG

“We are very satisfied with the new production plant for our blood products. It is extremely energy efficient, largely automated and as smooth in operations as was shown during the simulation in the planning phase.”

“PERFECT PROTOTYPE WELDING DEVICE. MEASURABLE GOOD RESULT”

Jacob Ruda,
VOLVO CAR CORPORATION / POLESTAR

“We are very satisfied with the devices that EDAG PS has developed, supplied and built for us. First measurements from the assemblies show an incredibly good result.”

“SOUGHT-AFTER SPECIALISTS, BEST SPARRING PARTNER”

Udo Jung,
TROX GmbH

“As a mid-sized manufacturing company, our product is the actual core competence. However, to be able to manufacture this at a high degree of automation and using the latest production techniques, we needed a lot of different specialists. We can’t afford this and are therefore happy to have found all of this at EDAG PS. My manufacturing engineers are therefore always up to date and have found the right sparring partner in EDAG PS, no matter what technology is required. An example from our company is the optimization of axial impeller production. Our turnaround times have been drastically reduced, while at the same time reducing error rates!”

STILL HAVE
QUESTIONS?

Dirk Keller

PLEASE CONTACT
RAINER WITTICH
CHAIRMAN OF THE BOARD OF MANAGEMENT
E-MAIL: RAINER.WITTICH@EDAG-PS.COM

phone
email
share
Social